图片由 Paranaguá Container Terminal 提供。
333m 全长的 “Cap San Maleas” 最近在巴拉那瓜集装箱港口打破了新纪录。
The vessel under the full management of Synergy Marine Group was the first to operate with 7 gantry cranes full time, enabling the facility to set an East Coast South America productivity record, with 158.4 PMPH (Port Moves Per Hour), and handling more than 3,000 moves in. The previous record, set at Santos in January, was 152 PMPH.
感谢 Ian D’Souza 船长、C/E Weeraratna 和“Cap San Maleas”上非常勤奋的团队,因为他们坚定不移地关注 Synergy 的安全和运营标准。 这使他们能够不仅为这一破纪录的壮举做出贡献,而且在客户和租船人的准时制战略方面发挥了非常充分的作用。
还要祝贺 TCP Terminal de Contêineres de Paranaguá 的辛勤工作团队。



